HydroBer

Sewerage & Drainage Design · Industrial park developer

Industrial Park Sewerage Masterplan

Combined sanitary and stormwater masterplan for a phased industrial park development, coordinated in 3D with site infrastructure.

Manhole cover set into new pavement with construction markings around it

Photo: Goose Green Photography, CC BY 4.0, via Wikimedia Commons

The challenge

A multi-phase industrial park development needed a sewerage masterplan that could be built out in stages without requiring rework as later phases connected in, while satisfying both sanitary capacity and stormwater attenuation requirements for the full build-out.

Our approach

  • Modeled sanitary flows and stormwater runoff for the full development at build-out, then reverse-engineered a phased network that would not need resizing as each phase connected.
  • Sized attenuation and control structures for the design storm return period required by the local authority.
  • Built a coordinated 3D model in Revit alongside the site civils team to resolve clashes with roads, utilities and building foundations before construction.
  • Produced a single masterplan drawing set referenced by each phase-specific construction package.

Outcome

  • Phase 1 construction proceeded without any sewerage rework required when Phases 2 and 3 connected in, avoiding the reopening of completed roadworks.
  • Stormwater attenuation sizing was approved by the local authority on first submission.
  • 3D coordination caught two significant clashes with planned building foundations before they reached site.
SoftwareRevitAutoCAD

Have a similar project?

Tell us the scope and stage of your project and we will come back with next steps.